期刊文献+

静压挤密桩工法在郑西铁路桥中的应用

Construction Technique of Static Compression Compacting Pile in Zhengxi Railway Bridge
下载PDF
导出
摘要 介绍了静压挤密桩在处理地基过程中成孔、夯填等施工工艺。实践证明静压挤密桩施工技术提高挤密桩的工作效率,降低地基处理的成本,并能达到消除地基土的湿陷性,提高地基承载力的目的。它作为一种新的施工方法,有着显著的经济效益与社会效益。 The paper introduced contruction technique of static pressure compaction pile which apply for boring hole and ram filling of ground treatment. It is proved that the technology of static pressure compaction pile can enhance the efficiency, decrease the cost of the ground treatment, eliminate the collapsible nature of ground earth, and enhance the ground bearing capacity. It will produce great economic benefits and social benefits as a new method of construction.
出处 《黑龙江水专学报》 2007年第4期57-60,共4页 Journal of Heilongjiang Hydraulic Engineering College
关键词 静压挤密桩 地基处理 成孔 施工工艺 static pressure compaction pile ground treatment boring hole construction technique
  • 相关文献

参考文献5

  • 1GB50021-2001.岩土工程勘察规范[S].[S].,2002..
  • 2GB50007-2002.建筑地基基础设计规范[S].[S].,..
  • 3JGJ79-2002.建筑地基处理技术规范[S].,2002..
  • 4刘金砺.桩基工程技术发展与应用[M].北京:中国建筑工业出版社,2003.
  • 5刘三仓,韩思珍.灰土桩挤密地基的桩土应力比及承载力探讨[J].岩土工程学报,1996,18(1):89-94. 被引量:11

二级参考文献5

  • 1团体著者,1991年
  • 2团体著者,地基与基础,1989年
  • 3团体著者,地基处理手册,1988年
  • 4团体著者,1985年
  • 5团体著者,概率论与数理统计,1980年

共引文献3618

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部