荫营煤矿主井提升设备不能满足生产要求,因此对设备的主胶带输送装置进行改造。针对安装机身过程中存在的问题进行了分析并提出了具体改进措施。
The hoisting device serving the main shaft of Yinying Mine is not able to meet the need of production,so it is necessary to make reform for the main belt conveying equipment of the hoisting.Having analyzed the problems existed in the process of the installation of the hoisting body,this paper puts forth the concrete measurements for its improvement.
出处
《山西煤炭》
1997年第4期37-38,50,共3页
Shanxi Coal