系统重构阶段机组最优恢复次序的模糊多属性决策法 被引量:9

Fuzzy Multiple Attribute Decision-Making Method for Units' Optimal Starting-up Sequence During the System Reconstruction
下载PDF
导出
摘要 系统重构阶段,合理安排各个火电机组的启动顺序对实现电力系统全停后系统的快速恢复具有重要的作用。文章使用模糊多属性决策理论来处理各种影响机组启动顺序的因素,建立了机组最优恢复次序的模糊多属性决策模型。采用模糊折衷型决策方法,对多个机组的启动顺序进行排序,得到机组的最佳启动顺序序列。算例的计算结果和调度人员的经验相符合,表明采用模糊多属性决策方法对火电机组的启动顺序进行优化是可行的。 The reasonable arrangement of the thermal power generating units' starting-up sequence during the system reconstruction stage is very important for the fast restoration of the power system after black-outs. Using the fuzzy multiple attribute decision-making theory, the paper handles the factors that influence the starting-up sequence of the power plants and established the fuzzy multiple attribute decision-making model of the optimal starting-up sequence of the thermal power generating units. The fuzzy compromise method is used in order to obtain the optimal starting-up sequence of the thermal power generating units. The result of the calculated example matches the experience of the dispatchers and this proves the feasibility of the fuzzy multiple attribute decision-making method in the sequence optimization problem of the thermal power generating units' starting-up.
出处 《电工技术学报》 EI CSCD 北大核心 2007年第11期153-157,共5页 Transactions of China Electrotechnical Society
关键词 系统恢复 模糊多属性决策 模糊折衷型决策方法 Power system restoration, fuzzy multiple attribute decision-making, fuzzy compromise method
  • 相关文献

参考文献7

二级参考文献43

  • 1郭凯明.电力客户信用风险分析与管理研究[J].广西电业,2003(12):30-32. 被引量:7
  • 2万华,李乃湖,陈珩,王力科,姚建国,王元林.用于培训仿真的快速网络拓扑形成与跟踪、修正算法[J].电力系统自动化,1995,19(5):12-16. 被引量:7
  • 3黄家裕.同步电机基本方程和短路分析[M].上海交通大学,..
  • 4Lindstorm R R. Simulation and Field Tests of the Black Start of a Large Coal-fired Generating Station Utilizing Small Remote Hydro Generation. IEEE Trans on Power Systems, 1990, 5(1):162-168
  • 5Adibi M M, Borkoski J N, Kafka R J. Power System Restoration-The Second Task Force Report. IEEE Trans on Power Systems, 1987, 2(2): 927-933
  • 6Zhu Y L. Graphic-assisted Expert System for Power System Black Restart. In: Proc of IEE International Conference on APSCOM'91. London: IEE, 1991. 514-517
  • 7Power System Restoration Working Group. Special Considerations in Power System Restoration. IEEE Trans on Power Systems,1992, 7(4): 1419-1427
  • 8Liou T S, Wang M J. Ranking fuzzy numbers with integral value[J]. Fuzzy Sets and Systems, 1992, (50): 247-255.
  • 9Liang G S, WangM J. Theory and methodology: fuzzy MCDM based on ideal and anti-ideal concepts[J]. European Journal of Operational Research, 1999, (112): 682-691.
  • 10Mariani E, Mastroianni F, Romano V. Field experience in reene-rgization of electrical networks from thermal and hydro units[J]. IEEE Trans on Power Apparatus Systems, 1984, 103(7):1707-1713.