期刊文献+

初至波走时层析成像中的正则化方法 被引量:31

Normalized approach in tomographic imaging of first breaks travel time
下载PDF
导出
摘要 波场的等效性、观测数据的有限性和观测误差等因素导致地球物理反演本身具有严重的多解性,降低这种多解性的一种重要途径就是对反演过程进行约束。传统的初至波走时层析成像方法,通常是在外部对模型空间施加显式的约束和平滑处理,这样就会破坏模型参数与传播算子之间的相关性,难以达到有效利用先验信息的目的,甚至会影响反演的稳定性。针对这一问题,本文将先验信息分为三类,在此基础上阐述了通过正则化手段将各种先验信息纳入到反演方程当中,替代传统的外部约束模式。理论试验结果表明,正则化方法比外部约束方法有效地提高了反演的精度和分辨率;将该正则化方法应用于实际二维资料处理,也得到了比较好的反演结果。 Because of equivalence of wave field,and the limitation and errors of surveyed data,the geophysical inversion has serious multi-solution and an important way reducing the multi-solution is to carry out constraint for the inversion process.The traditional first breaks travel-time tomographic imaging is usually to add apparent constraint to model space from outside and carry out slipping process,which can destroy the correlation between model parameters and propagation operator,and is difficult to reach the goal effectively using prior information,even affects the stability of inversion.In view of the difficulty,the paper divided the prior information into three categories and expounded how to add various kinds of prior information into inversion equations by normalized way on that basis,replacing traditional outside constrained mode.The theoretical tests showed the normalized approach can effectively improve the precision and resolution of inversion than that in outside constrained method; using normalized approach for 2-D practical data processing can also gain better inversion results.
出处 《石油地球物理勘探》 EI CSCD 北大核心 2007年第6期682-685,698,共5页 Oil Geophysical Prospecting
基金 "新世纪优秀人才支持计划"(批准号:NCEP-05-0384)资助
关键词 初至波走时层析成像 正则化 反演 约束 射线追踪 最小二乘QR分解(LSQR) first breaks travel-time tomographic imaging,normalization,inversion,constraint,ray tracing,least square QR dissolution(LSQR)
  • 相关文献

参考文献11

  • 1姚姚著.地球物理反演基本理论与应用方法.武汉:中国地质大学出版社,2005
  • 2Harlan W S. Regulafization by model redefinition. 1995, http://billharlan-. com/pub/papers/regularization, pdf
  • 3Bube K and Langan R. On a continuation approach to regularization for crosswell tomography. Expanded Abstracts of 69th SEG Mtg, 1999,1295-1298
  • 4Zhou H et al. Regularization algorithms for seismic inverse problem. Expanded Abstracts of 72nd SEG Mtg, 2002,942-945
  • 5王振宇,刘国华.走时层析成像的迭代Tikhonov正则化反演研究[J].浙江大学学报(工学版),2005,39(2):259-263. 被引量:16
  • 6Clapp R Get al. Regularizing velocity estimation using geologic dip information. Expanded Abstracts of 68th SEG Mtg , 1998,1851-1854
  • 7Clapp R G et al. Incorporating geologic information into reflection tomography. Geophysics, 2004,69 : 533-546
  • 8Fomel S. Shaping regularization in geophysical estimation problems. Expanded Abstracts of 75th SEG Mtg ,2005, 1673-1676
  • 9Fomel S. Shaping regularization in geophysical-estimation problems. Geophysics, 2007,72 : R29-R36
  • 10Stork C and Clayton R W. Linear aspects of tomographic velocity analysis. Geophysics, 1991,56 : 483-495

二级参考文献5

共引文献16

同被引文献517

引证文献31

二级引证文献262

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部