期刊文献+

土石围堰三维有限元渗流分析及防渗措施研究 被引量:2

Three-dimensional seepage analyses and seepage control measures for earth rockfill dam
下载PDF
导出
摘要 为了解决上游围堰防渗及绕坝渗漏问题,确定最优防渗方案,对炳灵水电站右岸松动体防渗帷幕的防渗方案进行了三维有限元渗流计算,并对右岸松动体帷幕的防渗范围和灌浆排数进行了敏感性分析。通过多种防渗方案的计算,对右岸松动体的防渗方案做了相应优化,建议了满足设计要求的防渗方案。 For the sake of solving seepage control of the upper cofferdam and leakage around the dam and determining optimum anti - seepage scheme, it was proposed to executed the three - dimensional seepage calculation on impervious curtain of the loose body on left bank for Bingling hydropower project, and to make the sensitivity analyses of anti - seepage range and rows of grouting as well. By calculation of various anti - seepage schemes, relative optimization was performed for the loose body on right bank in the seepage control scheme. That has satisfied design requirements of seepage control.
出处 《西北水电》 2007年第4期55-58,共4页 Northwest Hydropower
关键词 炳灵水电站 土石围堰 有限元方法 无压渗流分析 Bingling hydropower project earth rockfill dam FEM free surface seepage analysis
  • 相关文献

参考文献4

  • 1张有天 陈平 等.有自由面渗流问题的初流量法[J].水利学报,1988,(8):18-26.
  • 2朱伯芳.有限单元法原理及应用(第2版)[M].北京:水利电力出版社,1997.
  • 3华东水利学院.弹性力学中的有限单元法[M].北京:水利电力出版社,1996.
  • 4毛昶煦,段祥宝,李祖贻.渗流数值计算与程序应用[M].南京:河海大学出版社,1999.

共引文献3

同被引文献1

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部