摘要
以原太高速公路牧马河大桥桩基工程施工经验为基础,探讨了砼灌注桩施工方法,并就施工中出现的问题提出了处理措施。
Based on the experiences in the construction of the pile-foundation of Mumahe Bridge on the Yuantai Superhighway, this paper probes into the methods for the construction of the concrete cast-in-place pile, and puts forward some treating measures in the light of the problems occurring in the construction.
出处
《科技情报开发与经济》
2007年第31期242-243,共2页
Sci-Tech Information Development & Economy
关键词
桩基工程
砼灌注桩
施工方法
pile-foundation engineering
concrete cast-in-place pile
construction method