摘要 结合龙滩电厂电气主接线的特点,从电网运行的稳定性和保护发电机、主变压器以及厂用电的安全性、可靠性等方面,分析了龙滩电厂700 MW水轮发电机组装设发电机出口断路器(以下简称GCB)的作用及必要性。分析表明设置发电机出口断路器能提高系统的可靠性,有助于电厂的安全稳定运行和调试维护,并能产生一定的经济效益。 The performance and necessity oi Generator Gircuit Breaker (GCB) for 700MW hydro-generator , is analyzed from aspects of stability of power system, security and reliability of generator, main transformer and auxiliary power based on the main electric connection of Longtan hydropower plant. The analysis results show that the installation of GCB improves the reliability of hydropower plant system, which can not only be helpful for operation, debugging and maintenance of the plant but also bring economic benefit,
作者 余成军 李平
机构地区 龙滩水力发电厂
出处 《广西电力》 2007年第6期6-8,64,共4页 Guangxi Electric Power
关键词 龙滩电厂 700 MW水轮发电机组 发电机出口断路器 longtan hydropower plant 700MW hydro-generator set generator circuit breaker
  • 相关文献

参考文献4

二级参考文献6

共引文献112

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部