摘要
介绍了无锡市太湖新城污水处理厂的一期工程设计概况和所采用的改良型A2/O脱氮除磷工艺,分析、探讨了污水处理厂的调试、培菌、试运行过程中出现的问题,并针对性地采用了一系列的解决措施。由监测数据表明,该工艺运行可靠,出水水质稳定,实现了污水处理厂的正常运行。
This paper introduces the first stage project and the improved A2/O process which can remove phosphor and nitrogen in Wuxi Taihu Xincheng wastewater plant, analyzes some problems in wastewater plant which will appear during testing, bacterium cultivation and trial - operation course, and adopts a series of measures. The data indicates that operation and water quality of effluent is steady, and the plant could achieve a regular function.
出处
《污染防治技术》
CAS
2007年第6期109-111,共3页
Pollution Control Technology
关键词
改良型A^2/O工艺
调试
培菌
improved A^2/O process
test
bacterium cultivation