通过事故修复后的轴向双分裂变压器平衡线圈进行的性能试验,对青岛发电厂01启备变事故原因作进一步的分析,并对此类结构的变压器特别是平衡线圈的运行和监测措施提供试验依据,以保证变压器的安全运行。
By performance test of the balanced windings of axial double-split-windings transformer repaired after failure,the failure cause of No. 1 auxilary transformer of Qingdao power plant is further ana1ysed ,and the test basis is provided in order to guarantee the safty of the service and monitor for this type of transformers,especially the balanced windings of the transformer.
出处
《山东电力技术》
1997年第4期61-64,共4页
Shandong Electric Power