南水北调西线隧道中隐伏断层超前预报研究 被引量:6

The study of geological forecast to deeply buried tunnel fault in south-north water transfer west route project
下载PDF
导出
摘要 南水北调调西线工程线路地层倾角陡、沟谷纵横、地质构造复杂、隧道长,埋深大,同时要对1000 m以内的构造、岩溶、岩层划分等进行地质超前预报,利用以往的超前预报方法无法满足工程施工的要求.对于深长埋隧道断层的施工地质超前预报,本文使用CSAMT法探测技术,并进行了近场校正、各向异性校正、静态校正、分辨能力校正和联合反演等手段,进行了实际探测和对比分析,并取得了较好的探测效果. The south-north water transfer west route project has obvious characteristic. It is stratum slope angle cliffy, channel and vale excessively, geological structure complexity, tunnel long and deeply buried. In the mean time it must advance forecast to find out the geological structure, fault, and rock dissolve cavity and stratum transformation in the 1000 meter. It can not forecast and reach project construct according to the anciently method. This paper introduces the CSAMT technology to detect deeply buried tunnel fault and advance geological forecast in the south-north water transfer west route project. Meanwhile it research the near area revise, anisotropy revise, static state revise and resolving power revise, and use the method of unite reverse calculate etc. It carries through contrast and analysis with the actual inspect sample and obtain approvingly result.
机构地区 北京工业大学
出处 《地球物理学进展》 CSCD 北大核心 2007年第6期1948-1954,共7页 Progress in Geophysics
基金 水利部948项目(200309)基金资助
关键词 深长埋隧洞 地质雷达 隧道地震超前预报 可控源音频大地电磁法 南水北调 deeply buried tunnel, GPR, TSP, CSAMT, south-north water transfer
  • 相关文献

参考文献19

二级参考文献266

共引文献969

同被引文献96

引证文献6

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部