摘要
对秦皇岛发电有限责任公司4台主变冷却系统的控制回路进行了分析,指出了原设计中存在两个较大的缺陷,对机组安全、稳定运行构成隐患。提出了消除设计缺陷的具体方法,以避免由此引发的故障。
Based on the analysis of the four main transformer cooling system control circuits in Qinhuangdao Power Generation Co. Ltd. , the writer indicated two major deficiencies of the original design, which might lead incipient fault for unit safety and operation. In order to avoid the error, the corresponding improvement plan has been introduced in the article.
出处
《华北电力技术》
CAS
2007年第A02期37-39,共3页
North China Electric Power
关键词
主变冷却系统
控制回路
设计缺陷
main transformer cooling system
control circuit
deficiency of the design