分析了秦皇岛发电有限责任公司2号机组DCS系统在运行中出现的问题,阐述了DCS系统升级改造的必要性和可行性方案。
This article analyzed the problem of unit 2 DCS in Qinhuangdao Power Generation Co. Ltd. during its operation, and states thenecessity and feasibility of DCS enhancement.