在输电线路架线施工中,由于经常遇到复杂的地形环境,给施工带来许多问题。文章介绍了500 kV蔡荆线在不停电跨越10 kV线路中采用鱼塘塔设竹跨越架的方法进行施工的过程,解决了现场实际问题,填补了青海送变电工程公司在鱼塘内搭设跨越架施工的空白,为国家重点工程的按期完工解决了施工难题,具有推广价值。
The paper introduces the construction course of erecting bamboo cross- over structure of 500kV Caijiachong- Jingzhou transmission line that cross 10kV transmission line and pound without power interruption, the technique supplies the construction gap of erecting cross - over structure in pound of Qinghai power transmission and distribution company, and solves construction problems of completing state major project on schedule, besides the technique provides new construction approach of prosecuting transmission and distribution construction in southern river network areas, and possesses spreading value.