摘要 在输电线路架线施工中,由于经常遇到复杂的地形环境,给施工带来许多问题。文章介绍了500 kV蔡荆线在不停电跨越10 kV线路中采用鱼塘塔设竹跨越架的方法进行施工的过程,解决了现场实际问题,填补了青海送变电工程公司在鱼塘内搭设跨越架施工的空白,为国家重点工程的按期完工解决了施工难题,具有推广价值。 The paper introduces the construction course of erecting bamboo cross- over structure of 500kV Caijiachong- Jingzhou transmission line that cross 10kV transmission line and pound without power interruption, the technique supplies the construction gap of erecting cross - over structure in pound of Qinghai power transmission and distribution company, and solves construction problems of completing state major project on schedule, besides the technique provides new construction approach of prosecuting transmission and distribution construction in southern river network areas, and possesses spreading value.
出处 《青海电力》 2007年第4期32-36,共5页 Qinghai Electric Power
关键词 河网地区 输电线路 竹跨越架 架线施工 river network areas transmission line bamboo cross- over structure line stringing construction
  • 相关文献

同被引文献5

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部