期刊文献+

基于小生境Pareto遗传算法的混凝土桥面板维修优化 被引量:2

Maintenance Optimization of Concrete Bridge Deck Using the Niched Pareto Genetic Algorithm
下载PDF
导出
摘要 混凝土桥面板是桥梁组成部分中最易损坏的结构单元,维修频率最高.研究了在各种约束条件下如何得到混凝土桥面板最佳维修策略问题.建立了桥面板维修的多目标优化模型,同时满足费用最小化以及性能最大化等多个相互冲突的目标,并采用小生境Pareto遗传算法(NPGA)求解.结果表明,基于NPGA的桥面板维修优化方法提供了一系列可行解供桥梁管理者根据偏好进行挑选,增加了维修策略的选择范围.这种方法既可以避免单目标优化无法考虑其他影响因素的缺点,又可以克服多目标优化传统解法的某些不足,提高了维修决策的科学性、合理性,适于指导桥梁维修工程实践. As the most damageable component of bridge, the concrete bridge deck is most required to maintain. The problem of obtaining the optimal maintenance strategy of concrete bridge deck under limited resources restriction is investigated. A multiobjective optimization model of concrete bridge deck is therefore developed for several objectives which conflict with each other, such as minimizing the total cost but maximizing the performance simultaneously, and the niched Pareto genetic algorithm (NPGA) is introduced to solve the model. The multiobjective optimization of bridge deck maintenance based on NPGA provides bridge managers with a set of feasible solutions for selection in accordance to their own preference, by which not only the disadvantage of single objective optimization without other influencing factors taken into account can be avoided but also some defects can be overcome in conventional solutions to the problem of multiobjective optimization. In this way the maintenance decision will be made more scientific and rational so as to make the maintenance for existing bridges proper.
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2008年第1期125-129,共5页 Journal of Northeastern University(Natural Science)
基金 辽宁省交通科技重点项目(0512)
关键词 桥梁管理 维修策略 混凝土桥面板 多目标优化 遗传算法 NPGA bridge management maintenance strategy concrete bridge deck multiobjective optimization genetic algorithm niched Pareto genetic algorithm
  • 相关文献

参考文献7

  • 1Liu C L,Hammad A,Itoh Y.Maintenance strategy optimization of bridge decks using genetic algorithm[J].Journal of Transportation Engineering,1997,123(2):91-100.
  • 2Jacobs T J.Optimal long-term scheduling of bridge deck replacement and rehabilitation[J].Journal of Transportation Engineering,1992,118(2):312-322.
  • 3Liu C L,Hammad A,Itoh Y.Multiobjective optimization of bridge deck rehabilitation using a genetic algorithm[J].Microcomputers in Civil Engineering,1997,12:431-443.
  • 4Liu M,Frangopol D M.Multiobjective maintenance planning optimization for deteriorating bridges considering condition,safety and life-cycle cost[J].Journal of Structural Engineering,2005,131(5):833-842.
  • 5Liu M,Frangopol D M.Optimal bridge maintenance planning based on probabilistic performance prediction[J].Engineering Structures,2004,26:991-1002.
  • 6熊辉,史其信.混凝土桥梁面板维修的折衷规划优化[J].清华大学学报(自然科学版),2004,44(6):789-792. 被引量:13
  • 7Horn J,Nafpliotis N.Multiobjective optimization using the niched Pareto genetic algorithm[R].Urbana:University of Illinois,1993.

二级参考文献6

  • 1Jiang Y,Sinha K C.A dynamic optimization model for bridge management systems [J].Transportation Research Record,1989,1211:92-100.
  • 2Jacobs T J.Optimal long-term scheduling of bridge deck replacement and rehabilitation [J].J Transportation Eng,1992,118(2):312-322.
  • 3Cesear M,Santarnarina J C,Turkstra C J,et al.Risk-based bridge management [J].J Transportation Eng,1993,119(5):742-750.
  • 4Razaqpur A G,El Halim A O A,Mohamed H A.Bridge management by dynamic programming and neural networks [J].Can J Civil Eng,1996,23(5):1064-1069.
  • 5Miettinen K M.Nonlinear Multiobjective Optimization [M].Netherlands:Kluwer Academic Publishers,1999.
  • 6Ehrgott M.Multicriteria Optimization [M].New York:Springer-Verlag,2000.

共引文献12

同被引文献10

  • 1熊辉,史其信.混凝土桥梁面板维修的折衷规划优化[J].清华大学学报(自然科学版),2004,44(6):789-792. 被引量:13
  • 2Liu Chunlu,Hammad A,Yoshito I.Maintenance strategy optimization of bridge decks using genetic algorithm[J].Journal of Transportation Engineering,1997,123(2):91-100.
  • 3Estes A C,Frangopol D M.Minimum expected costoriented optimal maintenance planning for deteriora-ting structures:application to concrete bridge decks[J].Reliability Engineering and System Safety,2001,73 (3):281-291.
  • 4Jacobs T L.Optimal long-term scheduling of bridge deck replacement and rehabilitation[J].Journal of Transportation Engineering,1992,118 (2):312-322.
  • 5Razaqpur A G,El Halim,Mohamed H A,et al.Bridge management by dynamic programming and neural networks[J].Canadian Journal of Civil Eugineering,1996,23 (5):1064-1069.
  • 6Liu Min,Frangopol D M.Optimal bridge maintenance planning based on probabilistic performance prediction[J].Engineering Structures,2004,26 (7):991-1002.
  • 7中华人民共和国交通部.JTGH11-2004公路桥涵养护规范[S].北京:中华人民共和国交通部,2004.
  • 8Holland JH.Adaptation in natural and artificial systems[]..1975
  • 9Goldberg DE.Genetic Algorithms in Search, Optimization and Machine Learning[]..1989
  • 10郭鹏飞,韩英仕.离散变量结构优化设计的拟满应力遗传算法[J].工程力学,2003,20(2):95-99. 被引量:35

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部