青黄海底隧道接线工程近接地面建筑物段爆破震动控制数值分析 被引量:7

A Finite Element Analysis of Blasting Vibration in Qingdao-Huangdao Cross-harbor Tunnel Guide Line Project
下载PDF
导出
摘要 针对当今城市隧道中比较常见的爆破震动问题进行分析,采用动力有限元软件对青黄海底隧道接线工程中的典型断面进行爆破震动数值模拟。分析结果显示,当相邻段别炮眼起爆时间间隔大于50 ms以后,可忽略爆破震动的叠加效应,因此可采用分段模拟的方法对隧道爆破效果进行分析,在此基础上对本工程钻爆设计进行了讨论,并提出了改进建议。 Blasting vibration is a common problem in nowaday tunnel construction in cities. In this paper this problem is analyzed with numerical method using dynamic finite element program on the basis of Qingdao- Huangdao cross-harbour guide llne tunnel project. By analysis, it is proved that stage simulation in common blasting numerical analysis is feasible, and the rationality of blasting design is judged by stage simulation, and an improved design is presented and examined.
出处 《石家庄铁道学院学报》 2007年第4期71-74,共4页 Journal of Shijiazhuang Railway Institute
关键词 爆破震动 爆破设计 数值模拟 动力有限元 blasting vibration blasting design numerical simulation dynamic finite element
  • 相关文献

参考文献3

  • 1亨利奇.爆炸动力学及其应用[M].北京:科学出版社,1987.169.
  • 2冯叔瑜,王中黔.地铁爆破的震动问题[J].中国铁道科学,1999,20(2):30-34. 被引量:23
  • 3中国工程爆破协会.GB6722-2003爆破安全规程[S].北京:中国标准出版社,2003.

共引文献73

同被引文献45

引证文献7

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部