摘要
阐述了利用工程地质勘探资料,如何建立三维地面模型和三维地质层面模型。
It is described how to establish three dimensional land surface model and three dimensional stratum face model by use of engineering geology exploration data,as well as their application;the application of this system in Guandi and Jinping Works.
出处
《水电站设计》
1997年第1期92-101,共10页
Design of Hydroelectric Power Station
关键词
CAD
模型
计算方法
水电工程
工程地质
computer aided design,model ,topography,computational method.