摘要
给出一种分析模型,以湖南东江拱坝为例,进行了实际分期施工及蓄水过程的结构分析,论述了它的可能性,指出了存在的问题。
In this article,an analytic model has been given and the arch dam of Dongjiang River in Hunan Province is used to analyze the process of stage construction and impounding.This article also analyzes possibility and existing problems.At last the referential suggestion on the technique of stage construction has been put forward.
出处
《武汉水利电力大学学报》
EI
CSCD
1997年第2期28-32,共5页
Engineering Journal of Wuhan University
关键词
拱坝
分期施工
分期蓄水
arch dam
stage construction
stage impounding