摘要
首钢3号高炉2006年8月检修9天后送风,高炉恢复炉况顺利,并迅速达到历史最好水平。本文对恢复炉况过程和后期炉内调整进行了详细分析。
No. 3 BF in Shougang was repaired in August 2006, and it started successfully and reached the target output rapidly 9 days later. The course of reaching the target output and adjusting BF' s condition is analyzed in detail in the paper.
出处
《首钢科技》
2007年第6期31-34,共4页
Shougang Science and Technology
关键词
高炉检修
恢复炉况
达产
blast furnace repair, condition renewal, reaching the target output