摘要 战时维修机构承担的维修任务比较繁重,合理安排维修任务可以有效地提高武器装备作战使用的时间。为此,分析了战时维修任务的特点,以尽快恢复参战作战单元的战斗力为目标,提出一种动态维修任务调度的优化方法。考虑到问题的复杂性,首先把原问题分解为静态维修任务调度问题和动态维修任务调度问题,分别建立相应的数学模型,并提出模型的求解方法。动态维修任务调度模型以静态维修任务调度模型为基础,根据任务变化情况反复调用静态维修任务调度模型求解方法,实现了战场抢修任务的动态调度。模型求解方法简单,获得的近似解具有较高的精度,计算时间很短。针对战场瞬息万变的情况,利用该方法实现了近实时地动态维修任务调度。 The task of maintenance organization is very heavy at wartime. The usability of equipments may be greatly improved by valid task scheduling. In order to recover the battle effectiveness of units in battlefield as fast as possible, maintenance scheduling models are built on the basis of analysis to the feature of maintenance task. Maintenance task scheduling problem is very complicated, so the problem is decomposed into two sub-problem: static maintenance task scheduling problem and dynamic maintenance task scheduling problem. Corresponding mathematic models are built to these sub-problems and their solutions are proposed. Dynamic maintenance task scheduling is on the basis of static maintenance task scheduling. The dynamic task scheduling with the task changing in battlefield is realized by repeatedly call of static maintenance task scheduling. Approximations to the model are very close to the optimal with little calculation time cost. The method proposed here realized maintenance task dynamic scheduling in real time. Experiments show that maintenance task scheduling method is valid.
出处 《机械工程学报》 EI CAS CSCD 北大核心 2008年第1期92-97,共6页 Journal of Mechanical Engineering
关键词 维修 调度 优化方法 模型 Maintenance Scheduling Optimal method Model
  • 相关文献

参考文献10

二级参考文献44

  • 1Tan Jonathan S, Krame Mark A. A general framework for preventive maintenance optimization in chemical process operations. Computers Chemical Engineering, 1997,21(12): 1451-1469.
  • 2Dedopoulos I T, Smeers Y. An age reduction approach for finite horizon optimization of preventive maintenance for single units subject to random failure. Computers & Industrial Engineering, 1998, 34(3): 643-654.
  • 3Sayed M Metwalli, Mona S Salams. Computer aided reliability for optimum maintenance planning. Computers & Industrial Engineering, 1998, 35(3): 603-606.
  • 4Gharbi A, P Kenne J. Production and preventive maintenance rates control for a manufacturing system: an experimental design approach. Int. J. Production Economics, 2000, 65: 275-287.
  • 5Richard C C, Paul W Murdock Jr. Selective maintenance for support equipment involving multiple maintenance actions.European Journal of Operational Research, 2001, 129:252-258.
  • 6Chao Ton Su, Sung Chi Wu. Multi-action maintenance subject to action-dependent risk and stochastic failure. European Journal of Operational Research, 2000, 125(1):133-148.
  • 7Barlow R, Hunter L. Optimum preventive maintenance policies. Operations Research, 1960, 8:90-100.
  • 8JOHNSON S M. Optimal two- and three-stage production schedules with setup times included[J]. Naval Research Logistics Quarterly, 1954,1(1):61-68.
  • 9GAREY M, JOHNSON D,SETHI R.The complexity of flow shop and job shop scheduling[J]. Mathematics of Operations Reseach,1976,1(2):117-129.
  • 10NAWAZ M, ENSCORE E Jr, HAM I. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem[J]. Omega, 1983, 11(1):9-95.

共引文献84

同被引文献231

引证文献31

二级引证文献111

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部