基于未确知测度的建筑工程工期影响度分析

The analysis of influence degree of building construction quality based on uncertainty measure
下载PDF
导出
摘要 给出未确知测度、置信度的概念,建立了基于未确知测度的建筑工程施工资源对施工工期影响度确定模型,指出该模型在处理不确定性影响因素时丢失信息少,更实用、可靠,最后给出了工程实例加以验证。 The concept of uncertainty measure and degree of confidence is given in this paper. The determining model of influence degree of building construction quality do for rational period based on uncertainty measure is established. When this model handles uncertainty influencing factor, the drop-out is fewer than fuzzy mathematics. This model is more feasible and reliable. In the end, this model is proved by the engineering example.
出处 《山西建筑》 2008年第4期227-228,共2页 Shanxi Architecture
关键词 施工工期 未确知测度 不确定性 影响度 construction period, uncertainty measure, unascertained, degree of influence