摘要
结合工程概况,针对公路立交桥拆改工程中不能封闭公路和下穿电缆复杂的问题,从线路过渡工程、施工安全防护工程、基础工程等方面对方案进行了优化,以大大缩短工期和降低施工成本,给今后的桥梁拆改提供了参考依据。
Combined with the proiects general situation, and aiming at the complex problems of can' t seal road and beneath cable that happened in the remove and reform projects of road overpass, it gets the majorization to the program from line transition projects, construction safety prevention projects and basic project, to shorten the time limit of the projects and decrease the construction costs and gives reference to the remove and reform of the bridge after.
出处
《山西建筑》
2008年第3期335-336,共2页
Shanxi Architecture
关键词
线路过渡
基础工程
拆建技术
line transition, basic project, remove and build technique