期刊文献+

无黏结预应力技术在超长结构水池工程施工中的应用 被引量:4

Engineering application of unbonded prestress technology on the super length tank
下载PDF
导出
摘要 传统的超长混凝土防水结构设计通常需采用设置温度伸缩缝或设置后浇带来减少混凝土的收缩开裂。通过绍兴污水处理工程185.2 m×51.8 m×11.7 m超长结构曝气池的工程实例介绍不设温度伸缩缝和后浇带,采用无粘结预应力技术来解决超长结构钢筋混凝土易收缩开裂的问题以及该技术在施工中的注意事项。 Setting temperature expansion joints or post-casting strips are the traditional design to reduce the concrete cracks on the super length concrete structure.The design method for super length concrete structure without any expansion joints or post-casting strip has been introduced based on the project of Shaoxing sewage disposal basin by size of 185.2m×51.8m×11.7m.Also, the technical notice items in this construction are designated.
出处 《混凝土》 CAS CSCD 北大核心 2008年第1期112-113,117,共3页 Concrete
关键词 超长结构水池 无粘结预应力 温度伸缩缝 super length tank unbonded prestress temperature expansion joint
  • 相关文献

参考文献9

二级参考文献19

  • 1游宝坤.建筑结构裂渗控制新技术[M].北京:中国建材出版社,1998..
  • 2游宝坤.中国混凝土膨胀剂研究及其开发概况.建筑物裂渗控制新技术[M].北京:中国建材工业出版社,1994,7..
  • 3游宝坤 颜亨吉 韩立林 等.硅铝酸盐膨胀剂[P].专利号ZL91110609.1993.
  • 4游宝坤 李光明 黄春江 等.铝酸钙-硫铝酸钙膨胀剂[P].申请专利号.2002.
  • 5金树青 刘莉芳.明矾石膨胀剂材性及其在工程中的应用[J].安徽基建,1982,(3).
  • 6王延生 张桂清 等.混凝土用复合膨胀剂[J].硅酸盐学报,1987,(5).
  • 7王延生 江云安 等.铝酸钙膨胀剂性能及其应用[J]..
  • 8黄大能.“十五”计划将造就一个混凝土外加剂的时代[J].水泥与混凝土制品,2001,(3).
  • 9Hobbs D W. Concrete deterioration: causes, diagnosis, and minimising risk [J]. International Materials Reviews,2001,46(3) : 117 - 144.
  • 10薛群开 吴中伟.膨胀和自应力水泥及其应用[M].北京:中国建筑工业出版社,1985..

共引文献62

同被引文献10

  • 1ZHENG W Z, XIE H Y, YANG C F. Analysis and calculation of factors on curvature ductility of unbonded pre- stressed concrete beams [ J ]. Journal of Harbin Institute of Technology( New series). 2007, 14 ( 1 ) : 18 - 22.
  • 2CHAKRABARTI P R. Ultimate stress for unbonded post - tensioning tendons in partially prestressed beams [ J ]. ACI Structural Journal, 1995, 92 (6)689 -697.
  • 3PANNELL F N. The ultimate moment of resistance of unbonded prestressed concrete beams [ J ]. Magazine of concrete research, 1969, 21(66) : 43 - 54.
  • 4HARAJLI M H. Effect of span - depth ratio on the ultimate steel stress in unbonded prestressed concrete Member[J]. ACI Structural Journal, 1990, 87 (8) : 305 - 312.
  • 5GB50240-2002,混凝土结构工程施工质量验收规范[S].
  • 6GB50010-2002.混凝土结构设计规范[S].[S].,..
  • 7吴剑秋.梁板无粘结预应力施工技术[J].福建建材,2009(1):90-93. 被引量:2
  • 8张昌叙,张炜.混凝土圆形池钢筋分批张拉预应力损失计算[J].建筑结构,2009,39(3):25-27. 被引量:2
  • 9刘志刚.大型现浇钢筋混凝土水池无温度伸缩缝设计法[J].给水排水,2002,28(7):68-69. 被引量:1
  • 10杨路.水池结构设计浅析[J].西南给排水,2016,0(4):16-18. 被引量:1

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部