摘要
对白云山隧道施工中所使用的几种超前地质预报方法进行了分析,论述了这几种方法的工作原理及使用时的注意事项,提出了综合超前地质预报的观点,使其预报结论相互验证、相互补充,很好地解决了以前超前地质预报不准的难题。
This paper analyzes several geological extra-forecast methods used in Balyunshan tunnel construction, discusses the working principle and notices of these methods, proposes the view of comprehensive geological extra-forecast, in order to make forecasting conclusions mutual validate, complementation and to solve the difficult problem of inaccurate geological extra-forecast before.
出处
《山西建筑》
2008年第6期338-339,共2页
Shanxi Architecture
关键词
隧道
超前地质预报
原理
地质资料
tunnel, geological extra-forecast, principle, geological data