期刊文献+

市场环境下电力需求侧管理项目评估模型的改进 被引量:9

Improvement on DSM project evaluation model under market environment
下载PDF
导出
摘要 要建立电力需求侧管理(DSM)工作的长效机制,需要建立一套完善的DSM项目评估价体系,综合考虑各种实际因素对DSM项目评价指标的影响。在传统DSM项目成本效益分析模型的基础上增加了市场渗透率、"免费搭车"、"市场溢出"等因素,建立了上述因素改进后的评估模型算法,并应用实例对改进前后DSM项目评估模型进行了仿真分析,进一步验证了改进后评估模型的可行性和有效性,从而为政府主管部门开展DSM规划和实施工作提供了重要的决策依据。 In order to set up a long term DSM mechanism, it is needed to design a perfect DSM project evaluation model and comprehensively consider elements which affect DSM project evaluation index. According to traditional DSM project cost-effective analysis model, the paper adds market penetration,free ride, market overflow to set up new evaluation model algorithm, and uses an example to emulate the effect of the two DSM project evaluation models. So it further verifies the feasibility and effectiveness of the new evaluation model which will provide important dicision accordance for governments to make DSM policies.
出处 《电力需求侧管理》 北大核心 2008年第1期19-21,共3页 Power Demand Side Management
关键词 电力需求侧管理 评估模型 成本效益分析 DSM evaluation model cost-effective analysis
  • 相关文献

参考文献5

二级参考文献3

共引文献38

同被引文献88

引证文献9

二级引证文献213

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部