摘要
通过某地铁区间成功采用全包式分区防水施工的实例,介绍了在暗挖隧道中施工全包式分区防水的操作过程与技术要点,验证了该施工防水方案的可行性,以供参考借鉴。
Combined with successful application of wholly-covering and zoning waterproofing technique in regional tunnel of one subway the construction process and technical key points of wholly-covering and zoning waterproofing techniques in under ground-cut tunnel are intro- duced. Practice verified the practicability of this waterproof construction scheme, which provides good references for similar works.
出处
《山西建筑》
2008年第5期192-193,共2页
Shanxi Architecture
关键词
暗挖隧道
施工技术
施工缝
防水施工
under ground-cut tunnel, construction technology, construction joint, waterproof construction