摘要
有效的模具更换程序和专用设备能使换模时间达到最短,本文主要介绍了国外模具存取管理系统,提高了工作效率。
Minimzing changeover times is accomplished with effective die change procedures and equipments. Mainly introduced overseas integrated die handling and storage system, enhanced work efficiency.
出处
《模具制造》
2008年第1期71-75,共5页
Die & Mould Manufacture
关键词
模具装卸存取管理系统
更换程序
专用设备
工作效率
die handling and storage system
change procedures
special equipment
work efficiency