ATO供应链中航空运输及并行机生产协调调度问题 被引量:17

Study of Synchronized Scheduling of Parallel Machine Manufacturing and Air Transportation within ATO Supply Chain
原文传递
导出
摘要 研究了一类供应链中的生产和航空运输协调调度问题的特点.在此基础上,提出了解决该问题的理论框架.在该理论框架下,协调调度问题被分解为航空运输调度子问题和生产调度子问题.在对各子问题的定义和建模的过程中,考虑彼此之间的制约关系.建立了航空运输调度问题的整数规划模型,并证明了该问题等同于一个运输问题.在生产调度子问题中,考虑并行机的生产调度问题,证明该问题为NP完全问题,提出了解该问题的模拟退火算法. This paper studies the problem of synchronized scheduling of production and air transportation in supply chain. Based on the investigation of the properties of this problem, a solution frame work is proposed. Within this framework, the synchronized scheduling problem is decomposed into air transportation sub-problem and production scheduling sub-problem. The constraints between the two sub-problems are considered in the definition and formulation df each sub-problem. The air transportation problem is formulated as an Integer Programming problem. Also, it is proved that this problem is equal to an unbalanced transportation problem. Parallel machine scheduling problem is investigated in the assembly manufacturing stage. This problem is proved to be NP-completeness. Then, simulated annealing algorithm is presented to solve the problem.
出处 《系统工程理论与实践》 EI CSCD 北大核心 2007年第12期8-15,共8页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(70602014) 国家863/CIMS主题资助项目(2006AA04Z153)
关键词 供应链 协调调度 并行机 航空运输 supply chain synchronized scheduling parallel machine air transportation
  • 相关文献

参考文献15

  • 1Blumenfeld D E, Burns L D, Diltz J D,et al. Analyzing trade-offs between transportation, inventory and production costs on freight networks[J]. Transportation Research, 1985, 19B(5): 361 -380.
  • 2Blumenfeld D E,Burns L D,Diltz J D,et al.Synchronizing production and transportation schedules[J].Transportation Research,1991,25B:23-27.
  • 3Fumero F,Vercellis C.Synchronized development of production,inventory and distribution schedules[J].Transportation Science,1999,33:330-340.
  • 4Sarmeinto A M,Nagi R.A review of integrated analysis of production-distribution systems[J].IIE Transactions,2000,31:1061-1074.
  • 5Ruiz-Torres A J,Tyworth J E.Simulation based approach to study the interaction of scheduling and routing on a logistic network[C]//Proceeding of the 1997 Winter Simulation Conference,1997.
  • 6Chang Y C,Lee C Y.Machine scheduling with job delivery coordination[J].European Journal of Operational Research,2004,158:470-487.
  • 7Chen Z L,Vairaktarakis G L.Integrated scheduling of production and distribution operations[J].Management Science,2005,51(4):614-628.
  • 8Sun H Y,Wang G Q.Parallel machine earliness and tardiness scheduling with proportional weights[J].Computers & Operations Research,2003,30(5),801-808.
  • 9Bank J,Werner F.Heuristic algorithms for unrelated parallel machine scheduling with a common due date,release dates,and linear earliness and tardiness penalties[J].Mathematical and Computer Modeling,2001,33:363 -383.
  • 10Heady R B,Zhu Z.Minimizing the sum of job earliness and tardiness in a multimachine system[J].International Journal of Production Research,1998,36:1619-1632.

同被引文献207

引证文献17

二级引证文献87

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部