摘要
在对公路施工网络计划技术进行实用研究的基础上,就公路施工网络计划提出了工序划分五原则;明确了公路施工进度计划中的时日的两种表示法,描述了它们之间的换算关系。并结合我国公路施工进度计划管理的特点和人们制定施工进度计划时的现行思维方式,探讨了工序隶属度的计算方法,在此基础上,建立了考虑各工序隶属度的适合公路工程的单代号最小时距搭接网络的计算公式。从而促进网络计划技术与公路施工的结合。
On the basis of the practical research of network technique in highway construction, this paper advances five principles of working procedure about network technique in highway construction ,makes clear the two shows of day in highway construction schedule plan, and describes the conversion relation of them.Combining with the characteristic of highway construction schedule management in our country and the current mode of thinking in working out a construction schedule plan, this paper probes into the calculation method about the degree of subordination. On the basis of this and considering the degree of subordination in working procedure, the paper establishs the calculation formulae about minium distance of time single code name overlapping network suiting for highway construction.Thereby, it promotes the combination of network technique and highway construction, and changes the disjoined condiction of network technique and highway construction.
出处
《系统工程理论与实践》
EI
CSCD
北大核心
1997年第2期95-103,共9页
Systems Engineering-Theory & Practice
关键词
公路施工
工序
网络计划
highway construction
working procedure
the degree of subordination
overlapping network
day