期刊文献+

外倾式拱桥拱肋悬臂施工中扣锚索索力优化 被引量:1

Optimization of Anchor Fast Cable Force during Cantilever Construction of External Slanted Arch Ribs
下载PDF
导出
摘要 在缆索吊装斜拉扣挂施工中,拱肋线形与塔架位移控制是最关键的问题。为使成桥状态的线形和受力满足设计要求,简化拱肋拼装调索计算,采用零弯矩法来初估拱肋吊装过程中的扣锚索索力值,并利用ANSYS的一阶优化功能对其进行迭代优化,从而将结构优化计算理论引入到斜拉索索力确定中。 During erection and stay of cables, the key point is to control the arch rib alignment and displacement of the pylon. To meet the alignment and force as required in the design when the bridge is completed and simplify the calculation for arch rib erection and cable force adjustment, the zero moment method is adopted to estimate the anchor fast cable force with the first order optimization of ANSYS for iterative optimal analysis and the theory of structural optimal calculation to determination of the cable force is introduced.
出处 《中国市政工程》 2007年第A02期94-97,100,共5页 China Municipal Engineering
关键词 外倾式拱桥 缆索吊装 结构优化 索力 external slanted arch bridge erection with cables structural optimization cable force
  • 相关文献

参考文献3

二级参考文献6

  • 1C Fleury. An efficient optimality criteria approach to the minimum weight design of elastic structures [J]. Computer & Structures, 1980, 11(2): 163-173.
  • 2S Y Wang, Y B Sun, R H Gallagher. Sensitivity analysis in shape optimization of continuum structures [J]. Computer & Structures, 1985, 20(5): 582-593.
  • 3U Kirsch. Optimum structural design-concepts, methods and application [M]. McGraw-Hill Company, 1981. 246-254.
  • 4ANSYS, Inc. Theory Release 5.7 [S]. USA, 1998.
  • 5Lu Q, Xu Y. Optimum tensioning of cable-stays [A]. Proc. 3rd EASEC. Shanghai, China, 1991. 145-152.
  • 6Kasuga A, et al. Optimum cable-force adjustments in concrete cable-stayed bridge [J]. Struct Engrg, ASCE, 1995, 121(4): 685-694.