期刊文献+

基于遗传算法的软件工程资源配置优化模型 被引量:1

A Model for Optimized Distribution of Software Engineering Resources Based on Genetic Algorithm
下载PDF
导出
摘要 综合软件过程中人力、物力资源的合理安排与统筹规划,提出一种基于遗传算法的活动规划与资源配置模型。在遗传算法中采用执行矩阵作为染色体,矩阵编码的染色体涵盖了活动规划与资源配置两部分内容,克服了传统的二进制字符串编码在描述复杂方案问题时存在局限性。仿真实验结果表明:基于遗传算法的软件工程资源配置模型使软件开发过程中的资源得到了合理的分配,为软件过程的管理与控制提供了科学的方案与依据,提高了软件开发的效率,保证了软件开发的质量。 Considering the arrangement of the human and material resources in the software process,a model for activity planning and resource allocation based on genetic algorithon is brought forward.Genetic algorithms use the executive matrix as chromosome,which covers the matrix coding chromosome planning and the allocation of resources,and overcome the limitations in the traditional model which uses the binary string encoding.The simulation results show that the model makes a rational distribution of resources and provides a scientific basis for improving the efficiency of software development and the quality of software.
出处 《计算机仿真》 CSCD 2007年第12期166-169,共4页 Computer Simulation
基金 陕西省科学技术研究发展计划项目(2005K04-G13)
关键词 遗传算法 软件工程 资源配置 活动网络 Genetic algorithms Software engineering Allocation of resources Activity network
  • 相关文献

参考文献7

二级参考文献26

  • 1姚咏,熊光楞,范文慧.产品开发过程智能化分析与改进[J].计算机集成制造系统,2004,10(8):886-891. 被引量:3
  • 2熊光楞,张玉云,李伯虎.并行工程总体技术及实施方法研究[J].计算机集成制造系统-CIMS,1996,2(3):3-10. 被引量:25
  • 3(美)S.E.埃尔曼夫拉比 袁子仁等(译).网络计划模型与控制[M].北京:机械工业出版社,1987..
  • 4SHOUMAN M A,El-NOUR A,EBRAHIM S,et al.Mixed integer linear programming model for a time cost trade-off[J].Advances in Modelling & Simulation,1991,22(4):53-63.
  • 5ERENGUC S,SELCUK T.Time/cost trade-off problems with discounted cash flows using generalized benders decomposition[J].Naval Research Logistics,1993,40(1):25-50.
  • 6FENG Chungwei,LIU Liang,BURNS S A.Stochastic construction time-cost trade-off analysis[J].Journal of Computing in Civil Engineering,2000,14(2):117-126.
  • 7ICMELI O,ERENGUC S S.Resource constrained time/cost tradeoff project scheduling problem with discounted cash flows[J].Journal of Operations Management,1996,14(3):255-275.
  • 8HECHT M,HANDAL J.A discrete-event simulator for predicting outage time and costs as a function of maintenance resources[A].Proceedings of the Annual Reliability and Maintainability Symposium[C].2002,612-617.
  • 9BABU A J G,SURESH N.Project management with time,cost and quality considerations[J].European Journal of Operational Research,1996,88(2):320-327.
  • 10KHANG D B,MYINT Y M.Time,cost and quality trade-off in project management:A case study[J].International Journal of Project Management,1999,17(4):249-256.

共引文献37

同被引文献13

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部