摘要
宽尾墩联合消能技术,是传统二元水流消能方式迈进三维空间消能简单而有效的工程措施。通过岩滩水电站具体应用,并经过工程运行实践表明,可以兼收工程。
The technic of combining energy dissipation by means of flaring gate piers is a simple and effective measure for transition from two dimensional energy dissipation into three dimensional one.Through the application and practice on Yantan project the profitability and engineering economics can be proved.
出处
《广西科学》
CAS
1997年第2期155-160,共6页
Guangxi Sciences
关键词
水电站
消能池
宽尾墩
联合消能
岩滩溢流坝
hydro power station, bucket basin,flaring gate pier,effecfiveness of combining dissipation,flow condition