2Janet R, Yates & John H. Audi, Using Decision support Systems for Delay Analysis: The Project Management Perception Program.Project Management Journal. 1998,29(2) : 29-38.
3Barry B,Bramble & Micheal T. Callaham. Construction Delay Claims (Second Edition) John willey & Sons,Inc. , 1992.
4David Ariditi ,Bhupendra K. Pate(1989), Impact Analysis of Owner-Directed Acceleration. Journal of Construction Engineering and Management. 1989,115(1): 144-157.
5梁鑑.国际工程施工索赔[M].北京:中国建筑工业出版社,1996..
6Shi J J, David A. Construction Delay Computation Method Journal [J]. Construction Engineer and Management, 2001 ,(1).
5Householder L Jerry, Rutland E Hulan. Who Owns Float[J]. Journal of Construction Engineering Management, 1990,116(1) : 130-133.
6Sakka I Zafer, EI-Sayegh M Sameh. Float Consumption Impact on Cost and Schedule in the Construction Industry[J].Journal of Construction Engineering and Management,2007,133(2):124-130.
7Garza M Jesus, Prateapusanond Apirath, Ambani Nikhil. Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract[J]. Journal of Construction Engineering and Management,2007,133(11) :836-845.
8成虎.建筑工程合同管理与索赔[M].南京:东南大学出版社,2003.
9Garza M J esus , Prateapusanond Apirath , AmbaniNi- khil. Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract [ J]. Journal of Const ruction Engineering and Management , 2007,133( 11 ) :836-845.