摘要 总结了邹县电厂四期工程2×1000MW超超临界机组控制系统设计方案,分析和探讨了1000MW机组控制系统的配置特点,重点介绍了锅炉启动系统和汽机旁路控制。从既要确保机组安全经济运行,又要具有先进的自动化水平的角度,提出了目前阶段1000MW机组控制系统配置及随主辅机配套控制系统范围的建议。 The paper sums up the designed scheme of control systems of 2 × 1 000 MW generating units in Zouxian Power Plant phase Ⅳ Project, analyzes and discusses the control system configuration scheme of 1 000 MW units, and emphatically briefs the start -up system of boiler and by-pass control of steam turbine. From the angles of both ensuring the safe and economic operation of unit and having the advanced automation level,the paper puts forward the suggestions on control system configuration of 1 000 MW unit and the scope of control system supplied with the main and attxiliary equipment at present stage.
作者 毕建惠
机构地区 西北电力设计院
出处 《电力设备》 2008年第1期5-7,共3页 Electrical Equipment
关键词 超超临界机组 控制系统 配置方案 分散控制系统(DCS) 汽机数字电液控制系统(DEH) ultra-supercritical pressure unit control system configuration seheme DCS DEH
  • 相关文献

同被引文献4

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部