北京蓝色港湾工程基础底板为超长、超宽、超深混凝土地下结构,为避免因温度收缩引起开裂,基础底板、地下室外墙、地下室顶板采用跳仓法施工,并取消膨胀剂,使混凝土应力有效释放,达到防止开裂的效果。
The foundation slab of Blue Harbor Engineering is super-long, super-wide and super-deep water level concrete underground structures. Sequence construction methods are adopted in foundation slab, basement exterior wall and basement roof in order to avoid cracking caused by temperature contraction. Besides, the expansive agent is canceled so as to release concrete stress in result of preventing cracks.
出处
《施工技术》
CAS
北大核心
2007年第12期61-63,74,共4页
Construction Technology
关键词
混凝土
跳仓
膨胀剂
应力释放
养护
concrete
sequence construction
expansive agent
stress release
curing