期刊文献+

一种用于频率偏移时有效值计算的修正方法 被引量:8

Modified Method for Virtual Value Measurement with Frequency Deviation
下载PDF
导出
摘要 在中低电压等级的线路测控保护一体化装置中,可以较容易地实现手动同期功能,但两侧频率相差较大时,采用相同时间间隔采样会对模拟量有效值的计算带来很大误差。文中分析了频率偏离额定值较大时,利用傅里叶算法计算有效值的误差,提出了一种修正幅值的实用方法。通过理论分析和数字仿真表明该修正方法使有效值的计算精度大大提高,而且计算量增加不大,有很好的实用价值。 Hand-synchronization can be easily realized in the integrated protection relay and RTU for MV and LV line. If the frequencies between bus bar and transmission line are raueh different, the sampling with the same time interval will bring about errors in the Fourier algorithm. An effective method is presented to modify the errors in the Fourier algorithm when power frequency deviates from 50 Hz. The theoretical analysis and digital simulation indicate that the modified method can enhance precision by little calculations. Therefore it has great practical value in the proiect application.
出处 《电力系统自动化》 EI CSCD 北大核心 2008年第2期80-83,共4页 Automation of Electric Power Systems
关键词 微机保护 同期 傅里叶算法 频率偏移 microprocessor-based protection synchronization Fourier algorithm frequency deviation
  • 相关文献

参考文献5

二级参考文献15

  • 1胡艳婷 李本藩(HuYanting LiBenfan).一种供安全自动装置用的新的频率测量算法(A New Algorithm for Frequency Measurement Using in Safe—and—automatic Mechanism)[J].电力系统自动化(Automation of Electric Power Systems),1987,11(6).
  • 2李振然(Li Zhenran).利用傅立叶变换实现电力系统频率的测量(Using Fourier Transform and Adaptive Sampling to Realize Measurement of Power System Frequency)[J].广西大学学报(自然科学版)(Journal of Guangxi University(Natural Science Ed)),1996,21(4).
  • 3张涛 刘建飞 张忠理.新型数字式保护网络化硬件平台的研究[A]..第九届全国继保技术研讨会论文集[C].,..
  • 4Meil Waing S A, Tindall C E, Mcclay W. Frequency Tracking for Power System Control. IEE Proc-C, 1986, 133(2).
  • 5Terzija V, Djuric M, Kovcevic B, et al. A New Self-tuning Algorithm for the Frequency Estimation of Distorted Signals.IEEE Trans on Power Delivery, 1995, 10(4): 1779~1785.
  • 6Phadk A G, Thorp J S, Adamiak M G. A New Measurement Technique for Tracking Voltage Phaseoes, Local System Frequency, and Rate of Change of Frequency, IEEE Trans on Power Apparatus & Systems, 1983, 102(3).
  • 7Girgis A A, Peterson W L. Adaptive Estimation of Power System Frequency Deviation and Its Rate of Change for Calculating Sudden Power System Overloads. IEEE Trans on Power Delivery, 1990, 5(2): 585~594.
  • 8郭勇,1986年
  • 9梁合庆,电力系统自动化,1985年,6期
  • 10张志竟,电力系统自动化,1983年,5期

共引文献72

同被引文献84

引证文献8

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部