期刊文献+

京沪高速铁路箱梁架运设备展望 被引量:2

Prospect of box girder span equipment for constructing Jinghu high speed railway
原文传递
导出
摘要 介绍了国内高速铁路900t箱梁架桥机、运梁车、提梁机的研制工作,主要类型和主要结构,在客运专线的应用情况,并对在京沪高速铁路的应用作了展望。 Because of the protection of land resources and the safeguarding of 350km/h running speed for the train, 80% of Jinghu high speed railway line will be constructed as bridgework. Most of the rail track will be small and medium- sized bridge besides the existing bridges spanning rivers, railways and roads. The construction materials are 32m, 24m and 20m prefab double-line box girders, each with a weight of 900t. To accomplish the span of these box girders, span equipments like erecting crane for railway bridge span are needed and also necessary, and this article introduces the prospect of these equipments.
作者 陈灵
出处 《建筑机械化》 2008年第1期33-36,共4页 Construction Mechanization
  • 相关文献

参考文献2

共引文献8

同被引文献10

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部