摘要 对某热电厂的厂级生产过程管理系统完善升级的迫切性进行了描述,对其系统功能进行了说明,重点对系统升级的过程中遇到的关键问题进行分析,详细给出原系统客户端程序从Windows 98平台移植到Windows 2000/XP平台下的解决方法,并对如何完善系统中的ActiveX控件进行论述,并给出相关代码。针对该电厂中存在的多个实时数据源的问题,给出了一个合理的接口方案,将分散的数据统一存入数据库服务器中,以便对数据进行更好的管理。 The imminence of the production management system's upgrading in some certain thermo power plant was described, the function of the system was shown, and some key problems in system upgrading were analyzed. The solution to the problem how the client program to replant from Windows 98 platform to Windows 2000/XP platform was given. At the same time, how to consummate the Active X controls in the system was discussed and the correlative code was given. For a better management of data, to deposit the separated data to an exclusive database, a reasonable blueprint of interface was given to resolve the problem of multi-data sources.
出处 《电站系统工程》 北大核心 2008年第1期44-46,共3页 Power System Engineering
关键词 热电厂 生产过程管理系统 系统升级 thermo power plant production management system system upgrading
  • 相关文献

参考文献4

二级参考文献9

共引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部