期刊文献+

双拱结构X型钢管相贯节点试验研究 被引量:4

Experimental investigation of X-joint in double-arch structure
下载PDF
导出
摘要 结合曹娥江新型双拱空间钢管结构闸门工程,对3种X型相贯节点形式(无加强、肋板加强型和套管加强型)进行了静载和反复加载试验.通过分析静载试验数据发现,相对于无加强节点试件,肋板加强型节点试件极限荷载提高不是很显著,套管加强型节点试件极限荷载提高较大.两种加强措施对于节点的局部应力减小作用不大.从极限荷载和局部应力两方面比较可知,对于支管的轴向刚度大于主管的径向刚度的节点,主管管壁的加强(套管加强型)是一种较为合适的方法.通过分析反复加载试验数据也发现,3种形式节点的滞回曲线都比较丰满,节点的延性较好,反复加载和单向加载节点试件的破坏形式相近. Three types of X-joint, named separately as joint without reinforcement, joint reinforced with ribbed plate and joint reinforced with sleeve, were proposed and researched in static and cyclic experiments based on the Caoe River double-arch gate project. Comparing to the joint without reinforcement, the ultimate load of the joint reinforced with sleeve shows a prominent increase while the joint reinforced with ribbed plate only owns an inconspicuous increase, and both the reinforcement joints cannot effectively decrease the local stress. Comparisons of the ultimate load and the local stress show that the reinforcement with sleeve is more suitable for the joint with more axial rigidity in branch-tube and less radial rigidity in main-tube. The cyclic curves of three joints are chubby and have good ductility, and the failure mode under the cyclic experiment is similar to that under the static experiment.
出处 《浙江大学学报(工学版)》 EI CAS CSCD 北大核心 2008年第1期99-104,110,共7页 Journal of Zhejiang University:Engineering Science
基金 对绍兴市曹娥江大闸投资开发有限公司的资助表示感谢!
关键词 肋板加强型节点 套管加强型节点 静载试验 反复加载试验 joint reinforced with ribbed plate joint reinforced with sleeve static experiment cyclic experiment
  • 相关文献

参考文献8

  • 1陈以一,沈祖炎,翟红,陈扬骥,陈荣毅,杨叔庸,龚模松.圆钢管相贯节点滞回特性的实验研究[J].建筑结构学报,2003,24(6):57-62. 被引量:76
  • 2陈以一,王伟,赵宪忠,蒋晓莹,白翔,赵昭仪.圆钢管相贯节点抗弯刚度和承载力实验[J].建筑结构学报,2001,22(6):25-30. 被引量:74
  • 3CHIEW Sing-ping. Experiment and numerical stress analyses of tubular XT-joint [J]. Journal of Structural Engineering, 1999, 125(11): 1239-1248.
  • 4EFTHYMIOU M, DURKIN S. Stress concentrations in T/Y and gap/overlap K joints [C] // Proceedings of the 4th International Conference on Behaviour of Offshore Structures. The Netherlands: [s. n. ], 1985:429-431.
  • 5SCHUMACHER A N N. Experimental study on the fatigue behaviour of welded tubular K-joints for bridges [J]. Engineering Structures, 2006, 28: 745-755.
  • 6PACKER J A. The designing guideline of tubular joint [M]. Beijing: Science Press, 1997.
  • 7ZHAO X L. Design guide for circular and rectangular hollow section joints under fatigue loading [M]. Germany: Rheinland, 1998.
  • 8舒兴平,朱邵宁,夏心红,杨晓.长沙贺龙体育场钢屋盖圆管相贯节点足尺试验研究[J].建筑结构学报,2004,25(3):8-13. 被引量:33

二级参考文献11

  • 1沈祖炎 陈扬骥 等.上海市八万人体育场屋盖的整体模型和节点试验研究.第八届空间结构学术会议论文集[M].河南开封,1997..
  • 2日本建筑学会.钢管结构设计施工指南及解说[M].东京:丸善株式会社,1990..
  • 3刘鹏.方圆汇交平面钢管节点的刚度研究[M].同济大学,2001..
  • 4W F Chen 周绥平等(译).梁柱分析与设计[M].北京:人民交通出版社,1997..
  • 5CHEN W F TSUTA T A 著 周绥平等译.梁柱分析与设计[M].北京:人民交通出版社,1997..
  • 6刘鹏,学位论文,2001年
  • 7沈祖炎,第八届空间结构学术会议论文集,1997年
  • 8周绥平(译),梁柱分析与设计,1997年
  • 9LEE M M K, WILMSHURST S R. Strength of multiplanar tubular KK-joints under antisymmetrical axial loading[J] .Journal of Structural Engineering,ASCE , 1997,123 (6):755 - 764.
  • 10陈以一,王伟,赵宪忠,蒋晓莹,白翔,赵昭仪.圆钢管相贯节点抗弯刚度和承载力实验[J].建筑结构学报,2001,22(6):25-30. 被引量:74

共引文献171

同被引文献32

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部