南水北调中线工程是为了解决京、津、华北地区水资源紧缺而实施的战略性工程,丹江口大坝加高工程是中线工程的关键性工程之一。丹江口大坝初期工程在大坝加高施工期间仍然承担着汉江中下游防洪任务,妥善解决好丹江口大坝加高工程建设的顺利进行与初期工程的防汛度汛、正常运行管理关系,意义重大。现根据丹江口大坝加高工程施工期的度汛条件、度汛标准以及建设工期的要求等,对丹江口大坝加高施工期的度汛技术方案进行了探讨。
The dam heightening project in Danjiangkou is one of key projects in the Middle Route of the South-to-Norrth Water Transfer Project. During construction period, the Danjiangkou Dam still plays the role of flood control. Therefore, it is important to balance the dam heightening construction and flood control realization. According to the conditions and criterion of passing flood season and the construction period, the modes of passing the flood season are discussed.