摘要 丹江口大坝加高工程是国内最大的大坝加高续建工程,初期工程建成运行至今已有30多年,表层混凝土已出现了不同程度的老化,新老混凝土结合面处理时必须将老混凝土碳化层全部进行凿除。通过对老混凝土碳化层深度进行检查和处理研究,确定了碳化层凿除深度,保证了新老混凝土的结合面质量,减少了混凝土的凿除工程量,降低了工程造价,在本工程中得到了广泛推广运用。 Heightening the Danjiangkou Dam is the largest dam heightening project. The old project has been constructed and operated in the initial phase over 30 years, and the surface layer concrete have experienced varying degrees of aging. In order to combine old and new concrete surface, all the old concrete layer must be taken away. Carbonation of old concrete layer inspection and processing are studied in order to determine the depth of carbonation layer, ensure the combination of the old and new concrete surface quality, reduce the amount of concrete work , and lower construction costs.
出处 《南水北调与水利科技》 CAS CSCD 2008年第1期277-278,282,共3页 South-to-North Water Transfers and Water Science & Technology
基金 中央预算内专项基金项目
关键词 大坝加高 新老混凝土 碳化层 检查 处理 dam heightening old and new concrete carbide layer check treatment
  • 相关文献

参考文献4

  • 1[1]丹江口水利枢纽大坝加高工程初步设计报告(修订本)[R].长江水利委员会长江勘测规划设计研究院,2004.
  • 2[2]丹江口水利枢纽现场安全检查报告[R].丹江口:丹江口水利枢纽管理局,2002.
  • 3[3]丹江口水利枢纽大坝混凝土老化鉴定报告[R].武汉:长江水利委员会长江科学院,2002.
  • 4[4]丹江口水利枢纽老混凝土碳化深度检测报告[R].武汉:水利部长江科学工程质量检测中心,2006.