期刊文献+

接线座支架多工位级进模设计 被引量:5

Development of multi-position progressive die for a bracket of wire connecting pedestal
下载PDF
导出
摘要 分析了支架零件的成形工艺,介绍了1副利用自动送料初定位,导正销精定位,浮料销导料,连续进行零件轮廓冲切、弯曲,并最终将成品切离坯料的7工位级进模设计。 The forming process of a bracket in a wire connecting pedestal was presented. A seven-position progressive die was developed in which automatic feeding was used in initial locating, pilot pin was used in exact positioning, float stock guide pin was used in leading materials, the blanking and bending of the part were carried out continuously and finally the finished product was cut off.
作者 沈言锦
出处 《模具工业》 北大核心 2008年第2期16-18,共3页 Die & Mould Industry
关键词 接线座 冲裁 弯曲 多工位级进模 wire connecting pedestal blanking bending multi-position progressive die
  • 相关文献

参考文献8

二级参考文献4

  • 1王孝培.冲压手册[M].北京:机械工业出版社,1988..
  • 2黄晨光.激光辐照下几种金属材料的动态力学性质和结构热-力耦合的变形与破坏[M].北京:中国科学院力学研究所,1996..
  • 3朱兆祥.弹性结构的动态屈曲.材料和结构的不稳定性[M].北京:科学出版社,1993.158-173.
  • 4J. R. Crosby,D. J. Burns,P. P. Benham. Effect of stress biaxiality on the high-strain fatigue behavior of an aluminum-copper alloy[J] 1969,Experimental Mechanics(7):305~312

共引文献21

同被引文献12

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部