黄河三角洲孤东油田北海堤防护加固工程水下沉桩施工技术 被引量:1

Research on Construction Technology of Underwater Pile Driving for Northern Sea Wall Reinforcement in Gudong Oilfield at Yellow River Delta
下载PDF
导出
摘要 黄河三角洲胜利孤东油田北海堤需要加固维修,针对黄河三角洲海域的气象、水文、地质条件,分析了3种海上沉桩施工方案的可行性,最终选择了振动锤双体打桩船沉桩方案。文章重点介绍了振动锤打桩船沉桩施工的工艺流程、施工方法及步骤,总结了500m试验段的施工效果,提出了秋冬季海上打桩的有效措施。实践证明,在风力小于5级的情况下,采用120kW振动锤双体打桩船沉桩,速度快,质量好。 The northern sea wall in Gudong Oilfield at Yellow River Delta needed reinforcing so that the feasibility of three kinds of offshore driving pile construction methods was analyzed in consideration of the sea conditions of weather, hydrology and geology in Yellow River Delta area. Finally the driving pile construction scheme using vibrating hammer and piling catamaran was chosen. This paper focuses on the construction process, method and steps of pile driving using vibrating hammer and piling catamaran, summarizes the construction effect of 500 m long test sea wall, puts forward effective measures of offshore piling in winter and autumn. The practice proves that for wind scale less than 5, using 120 kW vibrating hammer and catamaran for pile driving is fast with good quality.
作者 姜则才
出处 《石油工程建设》 2008年第1期27-30,共4页 Petroleum Engineering Construction
关键词 海堤防护 水下沉桩 施工方法 seawall protection underwater pile driving construction method
  • 相关文献

参考文献2

  • 1夏东兴,王文海,武桂秋,崔金瑞,李福林.中国海岸侵蚀述要[J].地理学报,1993,48(5):468-476. 被引量:149
  • 2江苏省滩涂研究所.江苏滩涂研究[M].北京:海洋出版社,1992.

二级参考文献9

  • 1庄振业,青岛海洋大学学报,1989年,19卷,1期,90页
  • 2丁东,海洋地质与第四纪地质,1988年,8卷,3期,53页
  • 3陈宏友,海洋与海岸带开发,1988年,5卷,4期,39页
  • 4李光天,灾害学,1988年,2期,32页
  • 5团体著者,海岸带管理与开发,1988年
  • 6喻国华,海岸工程,1987年,6卷,1期,71页
  • 7王文海,海洋开发,1987年,1期,8页
  • 8程天文,海洋学报,1985年,7卷,4期,35页
  • 9袁迎如,科学通报,1983年,28卷,21期,1322页

共引文献151

同被引文献6

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部