摘要
介绍了如何设计先进的结构、选择适合的操作方法,彻底解决500 kV直线转角塔绝缘子串无法带电更换的技术难题。
This paper introduces the advanced structural design and how to choose proper operation method so as to completely resolve the technical problems in live replacing 500kV insulator string on suspension angle tower.
出处
《华北电力技术》
CAS
2008年第2期8-11,共4页
North China Electric Power