关键链多项目进度管理分析 被引量:15

Multi-project Scheduling Management Based on Critical Chain
下载PDF
导出
摘要 针对多项目进度管理问题,综合应用关键链和进度控制的方法,保证了多项目计划在不确定环境下的稳定运行.首先确定了多项目的"瓶颈"段的瓶颈缓冲,进而确定对后续项目的影响,通过缓冲检测图、进度计划图等手段进行进度的适时控制,以便采取相应的措施.该方法应用于工程进度管理的实例中,为工程决策与管理者全面而准确地掌握项目进度、保证项目如期完工,以及对后续项目进行合理地预测提供依据. A model is developed based on critical chain and scheduling control for the problems of multi -project scheduling management to enhance the stability of multi-project schedule under uncertain environment. This paper brings up the "bottle neck" firstly, and decides whether it influences follow-up items, then controls the schedule in time by the drawing of buffer-control and scheduling plan. This method is applied to the engineering scheduling management by an example, and consequently a good basis is provided for the project decision-maker and manager to make a reasonable engineering plan with correct control of the project schedule and then to guarantee the completion of the project. The future research directions of the critical chain technique are also discussed.
出处 《西安工业大学学报》 CAS 2007年第6期583-587,598,共6页 Journal of Xi’an Technological University
基金 陕西省科技厅基金资助项目(2006KR98)
关键词 多项目管理 关键链方法 瓶颈缓冲 进度控制 multi-project management critical chain method bottle neck scheduling control
  • 相关文献

参考文献3

  • 1[2]Goldratt EM.Critical Chain[M].New York.North River Press,1997.
  • 2[3]Patrick F S.Critical Chain and Risk Management-Protecting Project Value from Uneertainty[DB/OL].(2006-10-21)[2007-06-30].http.//www,focusdper-formance.com.
  • 3[7]Yeo K T,Ning J H.Integrating Supply Chain and Critical Chain Concepts in Engineer-procure-construct(EPC) Projects[J].International Journal of Project Management,2006,20(4):253.

同被引文献127

引证文献15

二级引证文献91

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部