期刊文献+

应用二沉池污泥层高度控制A/O工艺污泥回流量 被引量:5

Applying the sludge blanket height in the secondary clarifier to control sludge recycle flow rate of A/O process
下载PDF
导出
摘要 鉴于城市污水处理厂每日、每小时的进水量波动性很大,采用传统的恒定污泥回流比或固定污泥回流量控制会引起二沉池出现巨大的水力波动,从而影响系统处理效果.以二沉池污泥层高度作为控制变量,建立了回流污泥控制策略和控制器.采用A/O工艺中试试验装置,在处理实际生活污水的情况下,对所建立的控制器进行了验证,结果表明,与传统恒定污泥回流比控制相比,TN去除率可以提高10%,污泥回流量可以降低20%,且可以维持系统稳定运行. In view of the great fluctuation of inflow rate of urban wastewater treatment plant, adopting the traditional constant sludge recycle ratio or sludge recycle flow rate control more dangerous, which may cause significantly hydraulic fluctuation in the secondary clarifier, thus influencing the system removal efficiency. Using sludge blanket height as control parameter, the control strategy and controller of sludge recycle were established, and verified in a pilot-scale A/O biological nitrogen removal plant treating actual domestic wastewater. Compared with the traditional constant sludge recycle ratio control, TN removal rate could enhance 10%, sludge recycle flow rate could lower 20%, and could maintain the system stable operation.
出处 《中国环境科学》 EI CAS CSCD 北大核心 2008年第2期121-125,共5页 China Environmental Science
基金 高等学校博士学科点专项科研基金资助项目(20060005002) "十一五"国家科技支撑计划(2006BAC19B03) 北京工业大学青年基金资助项目(97005013200702)
关键词 污泥层高度 回流污泥回流量 控制器 A/O工艺 sludge blanket height sludge recycle flow rate controller A/O process
  • 相关文献

参考文献9

  • 1Lech R E Leslie Grady Jr C E Lim H C, et al. Automatic control of the activated sludge process-II. Efficiency of control strategies [J]. Wat. Res., 1978,12:91-99.
  • 2Bogaert H, Yuan Z, Grijspeerdt K, et al. New control strategy for the sludge recycle flow of activated sludge treatment plants [C]. Pads, France: 1st IWA World Congress, 2000.
  • 3Spanjers H, Vanrolleghem P A, Olsson G., et al. Respirometry in control of the activated sludge process: principles [M]. IAWQ scientific and technical report No.7,1998.
  • 4Olsson G, Jeppsson U. Establishing cause-effect relationships in activated sludge plants - What can be controlled [C]. Brugge, Belgium: Invited paper, Forum for Applied Biotechnology (FAB), 1994.
  • 5Ingildsen P. Realizing full-scale control in wastewater treatment systems using in situ nutrient sensors [D]. Sweden: University of Lund, 2002, ISBN91-88934 22 5.
  • 6Zhiguo Y, Herwig B, Christian R, et al. Sludge blanket height control in secondary clarifiers [C]. Sweden: The 1st IWA conference on ICA, Malmo, 2000.
  • 7Van Loosdrecht M C M, Heijnen J J. Modelling of activated sludge processes with structured biomass [J]. Wat. Sci. Tech., 2002,45(6): 13-23.
  • 8Beun J J, Paletta E van Loosdrecht M C M, et al. Stoichiometry and kinetics of poly-β-hydroxybutyrate metabolism in aerobic, slow growing activated sludge cultures [J]. Biotechnol. Bioeng., 2000,67(4):379-389.
  • 9Henze M, Dupont R, Crau E et al. Rising sludge in secondary settlers due to denitrification [J]. Wat. Res., 1993,27(2):231-236.

同被引文献30

引证文献5

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部