用沉降监测结果指导建筑物的纠偏施工 被引量:4

Subsidence Monitoring Results with the Guidance of Corrective Buildings Construction
下载PDF
导出
摘要 用基底掏土法对某7层砖混建筑物进行纠偏,对基础沉降进行密集监测。通过监测结果确定纠偏施工的取土量,施工节奏和施工速度等,有效控制了纠偏施工期间基础的挠曲变形,保证结构原有裂缝在纠偏期间不再发展,使建筑物纠倾后倾斜值小于9 mm。 Rectification of a seventh buildings used the indigenous basement,on the basis of settlement for intensive monitoring. Monitoring results through effective control of the corrective construction period based deflection, Guarantee cracks in the structure of the original development no longer corrective period, Correcting the building tilted after the dumping of less than 9 mm.
出处 《城市勘测》 2008年第1期150-153,共4页 Urban Geotechnical Investigation & Surveying
关键词 沉降监测 纠偏 掏土迫降 加固 千斤顶 Settlement Monitoring Correction The amount of soil forced landing Reinforcement Jack
  • 相关文献

参考文献3

  • 1JGJ123-2000.既有建筑地基基础加固技术规范.[S].,..
  • 2JGJ79-91.建筑地基处理技术规范.[S].,..
  • 3GB50292-1999.民用建筑可靠性鉴定标准.[S].,..

共引文献61

同被引文献22

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部