期刊文献+

企业R&D项目组合评价与选择方法 被引量:7

Evaluation and Selection Method of Enterprise R&D Portfolio
下载PDF
导出
摘要 在对国内外R&D项目组合评价与选择研究分析基础上,从实际出发建立了相应的评价指标体系,构建了基于DEA和BSC的评价模型,说明了运用模型进行项目组合评价与选择的过程。运用分枝定界法生成最优项目组合,考虑了项目间资源、收益和输出的相互影响,确定与企业战略相适应的R&D项目组合,为R&D项目组合选择提供了新思路。 Based on the analysis of worldwide researches on R&D portfolio selection, an evaluation index system is represented according to the reality. An evaluation model based on Data Envelope Analysis (DEA) and Balanced Scorecard (BSC) is established, and the evaluation and selection processes are also provided in the paper. Taking resources, benefit and outcome interactions into account, the Branch&Bound algorithm is applied for optimal R&D portfolio generation. Combining with the strategy of an enterprise, the final portfolio can be determined. This paper suggested a new approach for the selection of R&D portfolio.
出处 《工业工程》 2008年第1期72-75,共4页 Industrial Engineering Journal
基金 西北工业大学"英才培养计划"资助项目
关键词 R&D项目 组合选择 数据包络分析 平衡计分卡 分枝定界法 R&D project portfolio selection DEA BSC B&B algorithm
  • 相关文献

参考文献16

  • 1Roussel P A, Saad K N, Erickson T J. Third Generation R&D: Managing the link to corporate strategy [ M ]. Arthur D. Little, Inc. , 1991.
  • 2Schmidt R L, Freeland J R. Recent progress in modeling R&D project-selection processes [ J ]. IEEE Transactions on Engineering Management, 1992,39 (2) : 189-201.
  • 3Baker N R. R&D project selection model:An assessment [ J ]. IEEE Transactions on Engineering Management, 1974, 21 (4) :165-171.
  • 4Liberatore M J, Titus G J. The practice of management science in R&D project management[ J]. Management Science, 1983,29 (8) :962-975.
  • 5Danila N. Strategic evaluation and selection of R&D projects [ J]. R&D Management, 1989,19 ( 1 ) :47-60.
  • 6Hall D L, Nauda A. An interactive approach for selecting R&D projects [ J ]. IEEE Transactions on Engineering Management, 1990,37 (2) : 126-133.
  • 7Baker N, Freeland J. Recent advances in R&D benefit measurement and project selection methods [ J ]. Management Science,1975,21 (10) :1164-1175.
  • 8Schmidt R L. A model for R&D project selection with combined benefit, outcome and resource interactions [ J ]. IEEE Transactions on Engineering Management, 1993,40 ( 4 ) : 403-410.
  • 9余晓岭,魏薇,杨忠直.技术项目评价与选择方法研究[J].管理工程学报,2000,14(1):31-34. 被引量:27
  • 10Basso A,Peccati L A. Optimal resource allocation with minimum activation levels and fixed costs[ J]. European Journal of Operational Research ,2001,131:536-549.

二级参考文献4

共引文献268

同被引文献69

引证文献7

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部