印度的电力工业和输电电网的发展也较快速,但更引人注意的是近2a中在其输电电网规划中的巨大变化:由2005年公布的"发展765kV输电网和国际联网"改变为2007年的大力发展特高压交、直流输电组成的全国电网,并在几个五年计划水平上提出了远景特高压输电的全国电网结构,以及该电网中的主要运行问题及其解决途径。
India's power industry and transmission grids are also growing rapidly. In recent 2 years India's Central Electricity Authority (CEA) changed its transmission planning from "to develop 765 kV transmission grid and international interconnection" in 2005 to the development of UHVDC and UHVAC transmissions in 2007, meanwhile proposed the schemes of future National Grid for different "5-year plan" levels, and described its main technical problems as well as the technical measures to be taken.