摘要 华东电网500 kV滁马线马鞍山大跨越工程跨越塔塔高257 m,是国内目前投运的最高的输电线路钢管塔。塔体中央设置封闭式电梯井筒,内部配置下置式永磁同步无齿轮曳引机变频电梯,电梯提升高度达到了240m。铁塔结构的方案布置、设计和电梯形式的选用、设计等方面为输电线路大跨越结构电梯的选型和设计可提供借鉴。 The 257-meter-high transmission tower built for Ma'anshan crossing project of East China Grid's 500 kV Chu-Ma Line, which is the tallest steel tubular transmission tower in the nation, has closed elevator well in the center of the tower and is equipped with machine-gearless, permanent magnet, synchronous, gearless traction, and frequency conversion elevator with an elevation of 240 m. The tower structural configuration and design, and elevator selection and design provide references for other similar projects.
出处 《电力建设》 2008年第3期36-39,共4页 Electric Power Construction
关键词 跨越塔 电梯 设计与应用 large crossing transmission tower elevator design and application
  • 相关文献

同被引文献5

  • 1华东电力设计院.架空送电线路大跨越结构设计技术规定(试行)[S].北京:电力工业部电力规划设计总院,1998.
  • 2中国电力工程顾问集团公司,华东电力设计院.钢管塔没计应用研究[R].北京:中国电力工程顾问集团公司,2008.
  • 3DL/T5154-2002架空送电线路杆塔结构没计技术规定[S].北京:中国电力出版社,2002.
  • 4华东电力设计院.钢管塔登塔方案的研究[R].上海:华东电力设计院,2008.
  • 5DL/T 5092-1999 110-500kV架空送电线路设计技术规程[S],1999.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部