摘要
介绍了火电厂翻车机卸煤的实时监控与故障诊断系统的工作原理,硬件结构、软件设计、主要功能及其应用。
Yangcheng Huaiyin 500kV AC transmission line is a important part of Jin shu Transmission Project.The paper discusses and analyses the installation position of series compensation and the ratio of shunt compensation for Yangcheng Huaiyin 500kV AC line as viewed from technique, economy and operation management.
出处
《中国电力》
CSCD
北大核心
1997年第6期26-27,共2页
Electric Power
关键词
翻车机
过程监控
故障诊断
火电厂
kV AC transmission line installation position of series capacitance compensation ratio of shunt reactance compensation